25 May 2026

DCFC Subsidy in Quebec: How to Obtain Financial Assistance for the Installation of a Fast Charging Station?

The adoption of electric vehicles continues to grow in Quebec, increasing demand for high-performance and accessible charging infrastructure. To encourage businesses, municipalities, and organizations to take part in this energy transition, the Government of Quebec offers financial assistance through the Écorecharge program.

This subsidy makes it possible to significantly reduce the costs related to the acquisition and installation of direct-current fast charging stations (DCFC), as well as the electrical infrastructure work required for their deployment. Here is everything you need to know to take advantage of this program.

What is the Écorecharge program?

The Écorecharge program is a government initiative designed to accelerate transportation electrification in Quebec by financially supporting charging station installation projects in the following sectors:

  • Commercial
  • Municipal
  • Institutional
  • Private organizations
  • Certain public organizations 

The program covers both Level 2 charging stations and direct-current fast charging stations (DCFC).

What is the subsidy amount for a DCFC charging station?

Financial assistance of up to 50% of eligible expenses

The Écorecharge program reimburses up to 50% of eligible expenses related to:

  • The purchase of the fast charging station;
  • Its transportation;
  • Its installation;
  • The required electrical infrastructure;
  • Commissioning.

What is the maximum amount for a DCFC fast charging station?

For a direct-current fast charging station (DCFC), the maximum amount of financial assistance cannot exceed the acquisition cost of the charging station.

Simplified example

Expense Amount
Purchase of the DCFC $80,000
Installation and electrical infrastructure $60,000
Total eligible $140,000
Potential subsidy (50%) $70,000

Because the amount remains below the acquisition cost of the charging station ($80,000), the financial assistance could reach $70,000.

What expenses are eligible for the DCFC subsidy?

The program covers much more than the purchase of the charging station.

Acquisition of the charging station

Eligible expenses include:

  • The purchase of the fast charging station;
  • Transportation costs;
  • Accessories required for its use;
  • Pedestals;
  • Cable management systems.

Installation and electrical infrastructure

The following costs may also be eligible:

  • Electrical work;
  • Specialized labour;
  • Electrical material;
  • Connection to the electrical grid;
  • Commissioning of the charging station;
  • Protective bollards;
  • Repairing surfaces damaged during the work.

Energy management and power optimization

The program also covers:

  • Energy management systems;
  • Intelligent power-sharing solutions;
  • Equipment used to optimize existing electrical capacity.

This component is particularly valuable for sites that want to install several charging stations without having to significantly increase their electrical capacity.

Can the installation of future charging stations be prepared?

Oversizing work is eligible

Yes. The program recognizes the importance of planning for future growth in charging needs.

Costs related to:

  • Installing additional conduits;
  • Adding electrical panels;
  • Future sizing of infrastructure;
  • Preparatory work for future charging stations;

may be eligible even if all charging stations are not installed immediately.

This approach allows organizations to reduce future costs while taking advantage of work that has already been completed.

Do larger-scale projects benefit from special treatment?

Projects exceeding $150,000 in eligible expenses

When a project exceeds $150,000 in eligible expenses, it is considered a large-scale project.

In this context:

  • A specific agreement may be signed with the program administrator;
  • Part of the subsidy may be paid during the work;
  • The expenses do not necessarily all need to be paid before the application is submitted.

This measure makes it easier to carry out strategic projects involving several fast charging stations or major electrical infrastructure.

Are turnkey services eligible?

Yes, under certain conditions

When a company chooses a turnkey charging solution, the service provider may submit the subsidy application on behalf of the project.

However, the provider must demonstrate that the financial assistance obtained is effectively reflected in the cost charged to the user organization.

This approach allows businesses to simplify the administrative management of the project while benefiting from the available government assistance.

Important conditions to comply with

Date of the work

To be eligible:

  • The work must have been carried out after January 1, 2024;
  • The expenses must have been incurred while the program is in effect.

Electrical compliance

All work must be carried out in accordance with the Quebec Construction Code and performed by a qualified electrical contractor.

What expenses are not eligible?

Certain expenses are excluded from the program.

Examples of non-eligible expenses

  • Service and maintenance;
  • Extended warranties;
  • Network management fees;
  • Communication fees;
  • Weather-protection shelters;
  • Storage batteries;
  • Generators;
  • Solar panels;
  • Taxes;
  • Administrative fees.

A detailed project analysis generally makes it possible to quickly identify which costs are eligible and which are not.

Why call on an expert for your DCFC project?

The installation of a fast charging station often represents a major investment that requires:

  • An analysis of electrical capacity;
  • Energy planning;
  • Optimization of eligible costs;
  • Proper preparation of the subsidy documentation.
     

Support from Bornes Québec

At Bornes Québec, we support businesses, municipalities, and institutions at every step:

  • Needs analysis;
  • Feasibility study;
  • Energy management;
  • Equipment selection;
  • Turnkey installation;
  • Support with subsidy programs.

Our goal is to maximize your financial assistance while ensuring scalable and high-performance infrastructure.

FAQ on the Écorecharge subsidy for DCFC charging stations

What percentage of costs is covered by Écorecharge?

The program reimburses up to 50% of eligible expenses.

Are electrical work expenses eligible?

Yes. Electrical infrastructure work represents a significant portion of eligible expenses.

Can an energy management system be included?

Yes. Energy management systems are part of the eligible expenses.

Is there a maximum subsidy amount?

Yes. The program provides a maximum of $500,000 per site and per company.

Can the installation of future charging stations be prepared?

Yes. Certain oversizing work on the electrical infrastructure may be eligible.

Conclusion

Thanks to the Écorecharge program, Quebec businesses, municipalities, and organizations can significantly reduce the cost of installing a direct-current fast charging station (DCFC). By covering up to 50% of eligible expenses, including electrical infrastructure and energy management systems, this financial assistance facilitates the implementation of high-performance and sustainable charging projects.
With its expertise in planning, energy management, and turnkey installation, Bornes Québec supports organizations in developing optimized charging projects that comply with the requirements of the Écorecharge program.

Similar articles

05 June 2026

Return on Investment of a Fast Charging Station

05 June 2026

Hydro-Québec’s new variable pricing in 2026

25 May 2026

SGÉVÉ: the intelligent solution for installing charging stations in a multi-unit residential building